Washing trains at the depot is one of the crucial scenarios in the trial operation of the Nhổn – Hanoi Station line, which will take place over seven weeks before commercial operations begin in June.
- Overview of the 35 trillion VND railway project connecting various urban areas to Hanoi’s Old Quarter
- Overview of the 33 trillion VND metro line when 99% of the elevated section is completed
- Hanoi: Trial operation of the elevated railway section from Nhổn to Cầu Giấy
- Hanoi urban railway Nhổn-Hanoi Station testing trains since September 2020
- A look at 2 giant robots digging at S9 station of the Nhổn – Hanoi Metro line